Broad Street Pedestrian Bridge


 

 

 

 

Wascana Centre is constructing a new pedestrian bridge located at the Broad Street Bridge. The finishing touches, including landscaping and the addition of railings, are currently being completed, and the pedestrian bridge is scheduled to be open by approximately the third or fourth week of August.

 

 

Timeline: Follow the progress of the bridge's construction

  • Constructing Pavillions and Pathway Around Bridge: June 12, 2010 - July 27, 2010

Laying of Concrete and Tile for Pavillions and Pathway

Installation of Bollard Lights along Pathway

 

 

  • Laying Foundation for Pavillions Beside the Bridge: May 18, 2010 - June 12, 2010

Formation of Pavillion Pile Caps

Pouring Concrete for Pavillion Pile Caps

 

 

  • Connecting the Bridge Archway to the Mainland: April 19, 2010 - May 18, 2010

Formation of Base for Transition Slabs

Pouring Concrete for Transition Slabs

 

 

  • Preparing the Area for Further Construction: March 30, 2010 - April 19, 2010

Removal of Ice Bridge and Mainland Railings

Installation of Temporary Safety Railings on Bridge

 

 

  • Building the Bridge Archway: March 16, 2010 - March 30, 2010

Setting Steal Girders in Place

Laying the Deck Slabs

 

 

  • Constructing Legs to Support the Bridge: February 22, 2010 - March 16, 2010

Setting Abutments

Installation of Bridge Beams

 

 

  • Laying the Foundation for the Bridge: February 1, 2010 - February 22, 2010
  • Installation of Piles at North Pier

    Installation of Piles at South Pier 

     

  • Preparations for Construction Begin: December 23, 2009 –January 29, 2010

Installation of Construction Fence

Flooding of Ice Bridge